Tittel Handling Tool For Casing Tongs
Status
Hovedstatus
Detaljstatus
Under behandling info Under behandling Formaliakontroll utført
Søknadsnummer 20190405
Levert
Prioritet 2016.09.30, US 62/402,542
Sakstype PCT søknad
Internasjonal søknadsdato
Internasjonalt søknadsnummer PCT/US2017/054261
Løpedag
Allment tilgjengelig
Søker Cameron Technologies Limited (NL)
Oppfinner Dag Holen (NO) .... se mer/flere nedenfor
Fullmektig BRYN AARFLOT AS (NO)
Patentfamilie Se i Espacenet

Embodiments of a vertical pipe handler system (50) and method of its use include a casing tong handling tool (10) connected to a lifting tool (55) having a gripper head (51) and supported by an arm (53) of the vertical pipe handler system. The casing tong connection (33) of the handling tool is located toward the tool's lower end (21) and may be offset in a horizontal direction from the connection (29) to the lifting tool. The casing tong (60) then hangs off-center relative to the lifting tool. The amount of offset may be effective to prevent interference between the gripper head and a tubular being handled by the casing tong.

Se forsidefigur og sammendrag i Espacenet


A1

Beskrivelse

HANDLE TOOL FOR CASING TONGS

CROSS REFERENCE PARAGRAPH

This application claims the benefit of U.S. Provisional Application No. 62/402,542, entitled "HANDLE TOOL FOR CASING TONGS," filed September 30, 2016, the disclosure of which is hereby incorporated herein by reference.

BACKGROUND

This section is intended to introduce the reader to various aspects of art that may be related to various aspects of the present disclosure, which are described or claimed below. This discussion is believed to be helpful in providing the reader with background information to facilitate a better understanding of the various aspects of the present disclosure. Accordingly, it should be understood that these statements are to be read in this light, and not as admissions of prior art.

This disclosure relates to pipe handling equipment used on various drilling rigs, like jackup rigs, semisubmersible rigs, drill ships, or land rigs, and, in particular, to equipment used to perform vertical drilling tubular handling operations on the drill floor.

Drilling tubulars include drill pipe, tubing, and casing (“tubulars”) which are assembled by threading one section of tubular to the next. Management of tubulars on the drill floor is conducted by various vertical pipe handling components and features that retrieve tubular, position the tubular into the mousehole, and tighten one tubular to the next.

One of these handling components is the casing tong. Prior art handling of the casing tong is done by way of a separate arm that moves the casing tong, combined with time-consuming manual handling. This prior art approach limits accessible space on the drill floor and can present safety risks to workers. Therefore, a need exists to handle tubulars in less space than the prior art approaches, with less material and manual handling, and with improved levels of safety.

SUMMARY

This summary is provided to introduce a selection of concepts that are further described below in the detailed description. This summary is not intended to identify key or essential features of the claimed subject matter, nor is it intended to be used as an aid in determining or limiting the scope of the claimed subject matter as set forth in the claims.

Embodiments of vertical pipe handling system including a handling tool for casing tongs that eliminates the need for a separate, dedicated arm to handle the casing tongs. The handling tool is mounted in a tubular lifting tool of a vertical pipe handler. The lifting tool includes a gripper head. The handling tool includes a casing tong connection that may be offset from the handling tool’s connection to the lifting tool. This offset allows the casing tong to hang off-center, thereby avoiding interference between the gripper head of the lifting tool and the tubular being handled. In some embodiments, the handling tool includes at its lower end a triangular-shaped section that has the casing tong connection. To prevent the handling tool from tilting, a guide head of a lower guide arm of the vertical pipe handler may be used. A computer control system may be used to send one or more commands to the vertical pipe handler to place the casing tong in a correct position to connect two vertically oriented tubulars and, after connection, to move the casing tong out of the way as the vertical pipe handler presents a new tubular for connection.

BRIEF DESCRIPTION OF THE DRAWINGS

The subject disclosure is further described in the following detailed description, and the accompanying drawing and schematic of non-limiting embodiment of the subject disclosure. The features depicted in the figure are not necessarily shown to scale. Certain features of the embodiments may be shown exaggerated in scale or in somewhat schematic form, and some details of elements may not be shown in the interest of clarity and conciseness.

FIG. l is a view of an embodiment of a handle tool for casing tongs when connected to the gripper head of a vertical pipe handler.

FIG. 2 is view of an embodiment of the handle tool when gripped by the guide head connected to a lower guide arm of a vertical pipe handler.

Elements and Numbering Used in the Drawings

10 Handle tool or casing tong handling tool

20 First section

21 Lower end

23 Upper end

25 Vertical centerline

29 Lifting tool connection

30 Second section

3 1 Horizontal leg

33 Casing tong connection

35 Vertical leg

37 Far end

39 Flange

41 Connection means

45 Vertical centerline

47 Angled leg

50 Vertical pipe handler

51 Gripper head

53 First arm

55 Lifting tool

57 Guide head

59 Second arm

60 Casing tong

61 Column

DETAILED DESCRIPTION

One or more specific embodiments of the present disclosure will be described below. These described embodiments are only exemplary of the present disclosure. Additionally, in an effort to provide a concise description of these exemplary embodiments, all features of an actual implementation may not be described in the specification. It should be appreciated that in the development of any such actual implementation, as in any engineering or design project, numerous implementation-specific decisions must be made to achieve the developers’ specific goals, such as compliance with system-related and business-related constraints, which may vary from one implementation to another. Moreover, it should be appreciated that such a development effort might be complex and time consuming, but would nevertheless be a routine undertaking of design, fabrication, and manufacture for those of ordinary skill having the benefit of this disclosure.

Embodiments of a handle tool for casing tongs of this disclosure are mounted to a lifting tool of a vertical pipe handling system. The vertical pipe handling system may include a vertical racker column in communication with one or more arms. The lifting tool may be a heavy lifting tool connected to one of the arms and include a gripper head for handling tubulars T. The handle tool provides a casing tong connection point that may be offset in a horizontal direction from where the handling tool connects to the lifting tool. The amount of offset can be an amount effective to prevent a clash or interference between the gripper head of the lifting tool and a tubular T being handled by the casing tong. The connection of the handle tool to the lifting tool may any type of connection suitable for safely securing the handle tool to the lifting tool or gripper head.

The vertical pipe handler may perform all vertical pipe handling operations on the drill floor, including racking stands, building stands in the mousehole, picking up singles from the catwalk, laying out singles to the catwalk, and tripping in and out of the fingerboard. These functions may be fully automated with a robotic control system that controls and monitors all operations and protects the column and rig from operator failure. In embodiments, the control system may include software to execute a casing tong mode in connection with the handling tool of this disclosure. This control system sends commands and receives feedback from an arm of the vertical handler which is connected to the casing tong handling tool and may send commands and receive feedback from a casing tong connected to the handling tool.

Referring now to FIGS. 1 & 2, embodiments of vertical pipe handling system or vertical pipe handler 50 include a lifting tool 55 with a gripper head 51 and a casing tong handling tool 10 connected to the lifting tool 55. The lifting tool 55 is connected to a first arm 53 of the handler 50.

The arm 50 may be an upper arm moveable in the X-, Y-, and Z-planes. The lifting tool 55 or arm 53 also may provide for rotation of the gripper head 55 in a horizontal plane. The handler 50 may include a column 61 to which the arm 53 is connected.

The connection 29 to the lifting tool 55 is one suitable for connecting the tool 10 to the lifting tool 55. In some embodiments, the lifting tool connection 29 may be located below the gripper head 51. In other embodiments, the lifting tool connection 29 may be located on the gripper head 51. The gripper head 51 may also be used as the connection 29 and grip the handling tool 10.

The casing tong handling tool 10 may include a first section 20 that is connected to the lifting tool 55 and a second section 30 that provides a casing tong connection 33 that is offset in a horizontal direction from this connection 29 to the lifting tool 55. The casing tong connection 33 may include a flange 39 that receives means 41 such as a hook for connecting the casing tong 60 to the flange 39.

When the casing tong connection 33 is offset from the lifting tool connection 29, the casing tong 60 hangs off-center relative to the tool 10. The amount of offset — for example, as measured by the horizontal distance between a vertical centerline 45 of the casing tong connection 33 and a vertical centerline 25 of the lifting tool connection 29 — may be an amount effective to prevent a clash or interference between a tubular T being handled by the casing tong 60 and the gripper head 51. With this amount of offset, the tubular T can extend well above the casing tong 60 without interfering with the gripper head 51. To prevent the casing tong handling tool 10 from tilting, a second arm 59 of the handler 50 can be used. The arm 59, which may be a lower arm relative to arm 53 and moveable in the X-, Y-, and Z-planes, can include a guide head 57 that receives the tool 10 and keeps it in a correct vertical orientation.

The sections 20, 30 of the handling tool 10 may be square-shaped in cross-section or pipeor tubular-shaped in cross-section and may differ from one another in cross-section. In some embodiments, the first section 20 of the handling tool 10 may be include an elongated straight section located toward an upper end 23 of the tool 10. In other embodiments, the first section may be curved, at least in part. The upper end 23 may be mounted in the lifting tool 55, below the gripper head 51. Or, the upper end 23 may connect to, or be received by, the gripper head 51.

The second section 30 of the handling tool may include a non-vertical leg 31 or 47 that extends away from the lifting tool connection 29 and toward the casing tong connection 33. Arranged in this way, the leg 31, 47 provides the horizontal offset of the casing tong connection 33. The connection 33 may be located at the far end 37 of the leg 31, 47. In some embodiments, the leg 31 is a horizontal leg. In other embodiments, the leg 47 is an (oblique) angled leg. The second section 30 may use legs 31 and 47 in combination with a vertical leg 35 and form a triangular-shape. In some embodiments, the legs 31, 35, 47 form a right angle. The vertical leg 35 may be arranged coaxial to the first section 20.

Embodiments of a method for controlling a casing tong 60 on a drill floor include using a microprocessor and associated software to send one or more commands to a first arm 53 of a vertical pipe handler 50 that is connected to a lifting tool 55. The lifting tool includes a gripper head 51 for handling tubulars T and a casing tong handling tool 10 supporting the casing tong 60. The one or more commands place the casing tong 60 in proper position to connect two vertically oriented tubulars T together. After connection of the two tubulars, one or more commands may be sent to the arm 53 to move the casing tong 60 away from this connect-to position. The microprocessor and associated software may also send one or more commands to second arm 59 and its guide head 57 to help the tool 10 maintain a vertical orientation and prevent the tool 10 from tilting.

While the disclosure may be susceptible to various modifications and alternative forms, specific embodiments have been shown by way of example in the drawings and have been described in detail herein. However, it should be understood that the disclosure is not intended to be limited to the particular forms disclosed. Rather, the disclosure is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the disclosure as defined by the following appended claims.

The techniques presented and claimed herein are referenced and applied to material objects and concrete examples of a practical nature that demonstrably improve the present technical field and, as such, are not abstract, intangible or purely theoretical. Further, if any claims appended to the end of this specification contain one or more elements designated as “means for” or “step for” performing a function, it is intended that such elements are to be interpreted under 35 U.S.C.

1 12(f). However, for any claims containing elements designated in any other manner, it is intended that such elements are not to be interpreted under 35 U.S.C. 112(f).

Krav

CLAIMS1. A vertical pipe handler (50) comprising:a lifting tool (55) including a gripper head (51);a lifting tool connection (29);a casing tong handling tool (10) connected to the lifting tool by way of the lifting tool connection;the casing tong handling tool including a casing tong connection (33) located toward a lower end (21) of the casing tong handling tool;the casing tong connection being offset in a horizontal direction from the lifting tool connection.2. A vertical pipe handler according to claim 1 wherein the offset is by an amount effective to prevent interference between the gripper head and a tubular being handled by a casing tong (60) connected to the casing tong handling tool.3. A vertical pipe handler according to claim 1 further comprising a first arm (53) located above, and connected, to the lifting tool.4. A vertical pipe handler according to claim 1 further comprising a second arm (59) including a head (57), the second arm located to a side of the lifting tool. 5. A vertical pipe handler according to claim 1 further comprising the lifting tool connection being located on the gripper head.6. A vertical pipe handler according to claim 1 further comprising the lifting tool connection being located below the gripper head.7. A vertical pipe handler according to claim 1 further comprising the lower end of the casing tong handling tool including at least one non-vertical leg (31, 47), the casing tong connection being located toward one end (37) of the at least one non-vertical leg.8. A vertical pipe handler (50) comprising:a casing tong handling tool (10) connected at one end (23) to a lifting tool (55) having a gripper head (51): anda casing tong connection (33) located toward a lower end (21) of the casing tong handling tool;the casing tong connection being offset in a horizontal direction from the gripper head.9. A vertical pipe handler according to claim 8 wherein the offset is by an amount effective to prevent interference between the gripper head and a tubular being handled by a casing tong connected to the casing tong handling tool. 10. A vertical pipe handler according to claim 8 further comprising a first arm (53) located above, and connected, to the lifting tool.11. A vertical pipe handler according to claim 8 further comprising a second arm (59) including a head (57), the second arm located to a side of the lifting tool.12. A vertical pipe handler according to claim 8 further comprising a connection (29) of the casing tong handling tool to the lifting tool being located on the gripper head.13. A vertical pipe handler according to claim 8 further comprising a connection (29) of the casing tong handling tool to the lifting tool being located below the gripper head.14. A vertical pipe handler according to claim 8 further comprising the lower end of the casing tong handling tool including at least one non-vertical leg (31, 47), the casing tong connection being located toward one end (37) of the at least one non-vertical leg. 15. A method for controlling a casing tong (60) on a drill floor, the method being executed by a microprocessor with associated software, the method comprising:sending one or more commands to an arm of a vertical pipe handler (50) that is connected to a lifting tool (55), the lifting tool including a gripper head (51) and a casing tong handling tool (10), the casing tong being connected to the casing tong handling tool;wherein the one or more commands places the casing tong in a position to connect two tubulars T together or, after connection of the two tubulars, moves the casing tong away from the position.
Hva betyr A1, B, B1, C osv? info
Cameron Technologies Limited
Parkstraat 83 2514JG HAAG NL
Andøyfaret 3 4623 KRISTIANSAND S NO ( KRISTIANSAND kommune, VEST-AGDER fylke )
Andoyfaret 3 4623 KRISTIANSAND S NO ( KRISTIANSAND kommune, VEST-AGDER fylke )
Andoyfaret 3 4623 KRISTIANSAND S NO ( KRISTIANSAND kommune, VEST-AGDER fylke )
Andoyfaret 3 4623 KRISTIANSAND S NO ( KRISTIANSAND kommune, VEST-AGDER fylke )
Andoyfaret 3 4623 KRISTIANSAND S NO ( KRISTIANSAND kommune, VEST-AGDER fylke )
Fullmektig i Norge:
BRYN AARFLOT AS
Stortingsgata 8 0161 OSLO NO ( OSLO kommune, OSLO fylke )

Org.nummer: 979993269
Din referanse: 133238 ECH
  • Foretaksnavn:
  • Foretaksform:
  • Næring:
  • Forretningsadresse:
     

Kilde: Brønnøysundregistrene

2016.09.30, US 62/402,542

Statushistorie

Liste over statusendringer i sakshistorikk
Hovedstatus Beslutningsdato, detaljstatus
Under behandling Formaliakontroll utført
Under behandling Mottatt

Korrespondanse

Liste over sakshistorikk og korrespondanse
Dato Type korrespondanse Journal beskrivelse
Utgående PT Varsel om betaling av første årsavgift (3317) (PT20190405)
02-01 Via Altinn-sending PT Varsel om betaling av første årsavgift (3317) (PT20190405)
Innkommende, AR312356121 Søknadsskjema Patent
01-01 Søknadsskjema Patent Søknadsskjema Patent
01-02 Fullmakt Fullmakt
01-03 Erklæring: Søkers rett til oppfinnelse Erklæring Søkers rett til oppfinnelse
01-04 PCT pamflett PCT pamflett

Til betaling:

Betalingshistorikk:

Liste av betalinger
Beskrivelse / Fakturanummer Betalingsdato Beløp Betaler Status
Årsavgift 8. avg.år. 2024.09.10 3320 CPA GLOBAL LIMITED Betalt og godkjent
Årsavgift 7. avg.år. 2023.09.11 2200 CPA GLOBAL LIMITED Betalt og godkjent
Årsavgift 6. avg.år. 2022.09.09 2000 CPA GLOBAL LIMITED Betalt og godkjent
Årsavgift 5. avg.år. 2021.09.09 1650 CPA GLOBAL LIMITED Betalt og godkjent
Årsavgift 4. avg.år. 2020.09.10 1350 CPA GLOBAL LIMITED Betalt og godkjent
Årsavgift 1. tom 3. avg.år. 2019.09.10 2100 CPA GLOBAL LIMITED Betalt og godkjent
31905980 expand_more 2019.04.30 5900 BRYN AARFLOT AS Betalt
Denne oversikten kan mangle informasjon, spesielt for eldre saker, om tilbakebetaling, internasjonale varemerker og internasjonale design.

Lenker til publikasjoner og Norsk Patenttidende (søkbare tekstdokumenter)

Hva betyr A1, B, B1, C osv? info
Kapitler uten data er fjernet. Melding opprettet: 24.11.2024 03:26:50